|
Tender Title
|
Flaring Gas Metering Project
|
|
Tender Number
|
CMIT-PRT-10.30-260037
|
|
Tender Announcement
Website
|
ITT package is available on the COIBID website (https://coibid.com) .
Bidder must be registered on this website, if not yet registered so Bidder must click on the tab “Supplier User- Registration” to start registration. Once completing the registration application, please send email to dongyang@cnoociraq.com ; zhoubin8@cnoociraq.com ; MoghdadEmadAhmed@cmitfod.com; prtinfo@cmitfod.com to validate the registration. Note: During the registration application, please input either the project number or the mention “CNOOC Iraq Limited project” in target project.
Bulletins during the tender period will be uploaded inside the COIBID website.
Tender Contact Emails:
Ahmadkinan@cmitfod.com
- m@cmitfod.com
hariindradi1@cmitfod.com
achmadwardhana@cmitfod.com
khalidali@cmitfod.com
mohamedalhassan@cmitfod.com
abderrahmanezanoun@cmitfod.com
badreddinelarafi@cmitfod.com
chafikbenlamri@cmitfod.com
tangjq@cnoociraq.com
|
|
|
Tender Announcement
Section 1 INSTRUCTION TO TENDERERS
Section 2 PROPOSAL CONTENTS AND FORMS
Section 3 TECHNICAL REQUIREMENT
Section 4 SCHEDULE OF COMPENSATION
Section 5 PRO FORMA CONTRACT
|
|
ITT Section 1. Clause 9.0
|
Bid Closing Date: no later than 16:00 (Baghdad Time), on or before December 20, 2026.
|
|
ITT Section 1. Clause 5
|
All clarification and correspondences from Tenderers must be sent to all aforementioned Tender Contact Emails with official letter.
|
|
ITT Section 1. Clause 10.2
|
Bid Proposals must be submitted only ONLINE on the COIBID Website.
|
|
ITT Section 1. Clause 11.1
|
Tenderer’s bid Proposal shall be irrevocable for a period 360 calendar days (“Bid Validity Period”).
|
|
ITT Section 1. Clause 12.1
|
Fail to meet any of below key factors will lead to disqualification:
- Scope of Business must be related to the scope of work of the tender.
- Legal Entity and Qualification of Bidder.
- Bid proposals are properly submitted.
- Bid Proposal Period of Validity shall be as required in this TENDER DATA SHEET (TDS) (aforementioned Clause 11.1).
- Bid Bond submission & Performance Bond commitment
- Signed & Stamped Cover Letter (as per Section 2 PROPOSAL CONTENTS AND FORMS, Attachment 2A: Proposal Format of Cover Letter)
- Price proposal is separate from Technical & Commercial proposal.
- No significant deviation on ITT requirements.
- Bidder's Financial Health: Meeting Company’s minimum requirement.
- Bid Proposal Signed by Bidder’s Legal Representative(s) or Authorized Representative(s).
- The Bidder must have valid English version ISO Certificates including ISO 9001, ISO 14001, and ISO 45001 (or OHSAS 18001). Equivalent Certificates from a Parent Company or the Same Group are not acceptable. ISO Certificates must be issued by a valid certification agency accredited by any accreditation body member under the IAF Multilateral Recognition Arrangement.
- The Design/Engineering Entity of the Bidder must have extensive experience in Oil and Gas Treatment Facilities (Including one or more of the following Central Process Facilities/Chemical plant/Refinery, Gas Treatment Plant, Degassing Stations), with valid supporting documents, and provide an Engineering Entity profile with supporting documents. The Bidder must provide the Contract Agreement with the elected Design/Engineering Entity, such as a Memorandum of Understanding (MOU), a signed Technical Service Agreement (TSA), or an Authorization Letter.
- The Bidder must have experience in EPCC Projects for Oil and Gas Treatment Facilities (Including one or more of the following Central Process Facilities/Chemical plant/Refinery, Gas Treatment Plant, Degassing Stations) in the past Seven (7) years (Y2019–Y2025), specifically it must demonstrate a total cumulative Contracts value of at least (2.0) million USD during the same period, supported by valid proving documents such as Signed Contracts for each Project (Signed Contract for each Project is mandatory).
- The Bidder must have at least one single Contract signed in the past Seven (7) years (Y2019-Y2025), with a value of not less than (1.0) million USD in EPCC Projects for Oil and Gas Treatment Facilities (Including one or more of the following Central Process Facilities/Chemical plant/Refineries, Gas Treatment Plant, Degassing Stations), supported by all valid proving documents (Signed Contract for each Project is mandatory).
- The Bidder must have One Direct Procurement Contract (Equipment or Materials) with total value of not less than (0.75) million USD in the past Seven (7) years (Y2019-Y2025) between the Bidder and Vendor’s supported by all valid proving documents (e.g., Procurement Contract cover page, first page, signature page, price page, equipment and/or material supply list, and delivery on-site inspection records... etc.).
- The Bidder must include in its tender technical proposal documents at least two Memorandums of Understanding (MOUs), Cooperation Agreements concluded between the Bidder and flowmeter manufacturers listed in the Approved Vendor List (AVL) of this Project.
- The Contractor must pass the Past Performance Evaluation Criteria at MISSAN Oilfield, where only Bidders with Accepted Past Performance Records, as well as New Bidders to the MISSAN Oilfield, shall be considered qualified.
Note:
- All necessary and valid supporting documents (Including Contract Cover Page, Signed Page, Total Amount, Completion Support Documents, Approved PIDs, MOU with Sub-contractor Entities and Profile, etc.) shall be submitted to prove the Bidder's compliance with the above-mentioned essential evaluation criteria.
- The supporting documents for the contracts must have been signed within the seven (7) years immediately prior to the date of this bidding announcement.
- The experience and value of the contract signed by the Consortium/Joint Venture will not be considered as supporting documents.
- For key items 2 and 3, bidder shall have at least one EPCC contract containing the required scope during the past seven years from 2019 to 2025. For the design scope, bidder shall provide the required documents as clearly mentioned in key item 2.
|
|
ITT Section 1. Clause15.1
|
Bid bond: US$ 75,000.00 (Sevent Five Thousand US Dollars).
- For Letter of Guarantees; the Original Bid Bond must be submitted to Company in a sealed envelope and duly marked and stamped on outer envelope, to the Company office in Iraq: Address: Rooms 239/238, FOD Administrative Building. Work Base, CNOOC Camp, Missan Oil Fields.
- For other Bid bond types (TT, Swift, Cash); the justification documents to be uploaded on the COIBID Website.
The original validity of the bid bond shall be the same as aforementioned Bid Validity Period in Clause 11.1.
Cash Bid Bond will not be accepted from a Chinese Bidder that does not have overseas Bank account.
Tenderers should be advised that Cheques ARE NO LONGER ACCEPTED as a Bid Bonds by Company.
|
|
ITT Section 2. Clause3.5
|
Joint bidding is NOT accepted by Company.
|
|
ITT Section 2. Clause 2.7
|
Tenderers should strictly comply and follow Subcontracting requirements and conditions mentioned in this clause.
|
|
ITT Section 1. Clause 26.0
&
ITT Section 2. Clause 3.9
|
Company prohibits firmly and strictly Collusive Bidding and any kind of collusive behaviors that will be detected and confirmed by Company at its sole discretion.
|