Invitation for Quotation
Date: Aug 24th, 2011
Quotation No.:CILBWOD-770-PRT-10.30-00072
Dear Sir/Madam,
CNOOC IRAQ LIMITED (BVI) (hereinafter referred to as COMPANY), a company existing under the laws of British Virgin Islands (BVI), hereby invites your company to submit a quotation for Brick wall construction service for landing camp, to support COMPANY’S petroleum operations in the Missan Oil fields in Iraq.
1. Project Descriptions:
|
S.N |
Item |
Description |
Quantity |
Unit price (USD) |
Total price (USD) |
|
1 |
Brick wall construction |
Site leveling, material procurement, wall construction and site clearance as requirement by client. |
532m |
|
|
|
2 |
Remove fence |
Remove fence of northeast side |
193m |
|
|
|
3 |
Caravans |
Supply and install two Caravans with air conditioner, |
2 sets |
|
|
|
4 |
Caravan |
Supply and install Caravan with air conditioner with one isolation room for storage |
1 set |
|
|
|
5 |
Movable Toilets |
Supply and install two LxWxH 1.5X1.5X2.4m Movable toilet with two 1m3 water tanks and excavate 1 m3 septic tank |
2sets |
|
|
|
6 |
Main gate modify |
Install a wicket door at the main gate of camp and Guest House |
2sets |
|
|
|
7 |
CCTV system |
Purchase and installation the CCTV system |
1 set |
|
|
|
7.1 |
NVR |
Net Video Recorder Configured with Video Management Software, M-JPEG, MPEG-4 and H.264 compression; USB interface; 10M/100M self-adaptive Ethernet port |
1 set |
|
|
|
7.2 |
HD |
Hard Disc, 3.5”SATA 1TB |
4 sets |
|
|
|
7.3 |
PC |
Desktop PC with intel Core i5 processor (minimum), 22” LCD Monitor, 3 GB DDR, R/W CD/DVD-ROM,1 500GB disk capacity, Microsoft Windows Operating system(Win 7 En), Software. |
2set |
|
|
|
7.4 |
Outdoor IP Dome Camera |
IR camera illumination,1/4″ CCD, horizontal resolution min 480 lines, min illumination 0.5Lux, optical 30X and 12x digital zoom, 100m detection range, day/night mode, PTZ control, PoE function ,Alarm function, ingress protection min IP65 , Operating temperature -10℃~70℃, with Mounting kit. |
2 sets |
|
|
|
7.5 |
Outdoor IP Camera |
IR camera illumination,1/3″CCD, horizontal resolution min 420TVL, min illumination 0.5Lux, 100m detection range, day/night mode, Alarm function,PoE function, ingress protection min IP65, Operating temperature -10℃~70℃, with Mounting kit. |
10sets |
|
|
|
7.6 |
Alarm bell |
Combined audible and visual alarm |
2 sets |
|
|
|
7.7 |
Software |
All Software and licence |
1 lot |
|
|
|
7.8 |
Spare parts |
Spare parts for Construction, Commissioning & Start-up and 1 years operation |
|
|
|
|
7.9 |
Power cable |
Armed outdoor AC Power cable,250V |
1000 metres |
|
|
|
7.10 |
Category 5E cable |
Armed Category 5E cable |
1000 metres |
|
|
|
7.11 |
Special tools |
Special tools for operation and maintenance tools including equipment, if any |
|
|
|
|
7.12 |
Site service |
1 person 2 days, including installation and commissioning |
|
|
|
|
Say US Dollars |
Total amount: |
||||
2. Scope of Work
All prices specified in this Quotation are inclusive of but not limited to: Material procurement, transportation, construction, installation and commissioning.
Site leveling
Brick wall procurement and construction
Modify main gate
Caravans with air conditioner purchase and installation
Caravan with air conditioner with one isolation room for storage
Movable toilets purchase and installation
CCTV system purchase and installation
Detail drawing and technical requirement see:
CILBCFQ-771-SCW-15.01-10023-0_ Brick Wall Layout-Model
CILBCFQ-771-SCW-15.01-10022-0 BRICK WALL PLAN ELEVATION AND SECTION
CILBCFQ-771-SCW-15.03-10007-0 SPECIFICATION FOR GUARD HOUSE
CILBCFQ-778-SCW-15.03-10003-0 SPECIFICATION FOR MODULAR POLYESTER WC-SHOWER CABIN
3. Construction period:
Contractor shall complete all the work listed above within 30 days after award Contract.
4. Payment Terms:
The payment shall be made within 45 days upon final acceptance of Brick Wall.
5. Proposal :
Contractor shall provide the below listed documents as the attachments of quotation:
5.1 Project Management Plan
5.2 Project Schedule
5.3 Procurement Plan
5.4 Construction Plan
5.5 Quality Plan
5.6 HSE Plan
6.Deadline and Address:
Your Quotation must be received at COMPANY’s office in Iraq for the attention of the following contact person no later than 17:00, on or before Aug 26th, 2011 (Iraq Time) at COMPANY’S designated address as below:
Attention: Mr. Liu Kai
Address: CNOOC CAMP in Buzurgan Terminal of Misssan Oil Field
Tel No.: 00964-7807736547
Fax No.:
Since it is a running project, your immediate response is highly appreciated.
Thank you for your support to our operation and please feel free to contact us if you have any questions.
CNOOC Iraq Limited (BVI)
Email:bid@cnoociraq.com