Tender Announcement

CNOOC Iraq Limited, a company existing under the laws of British Virgin Islands, acting as lead contractor of the Technical Service Contract for Missan Oil Fields entered into by and between Missan Oil Company, TP Missan Limited and Iraqi Drilling Company, Is pleased to make the following public tender announcement:

1. Tender details: 

Tender Title

Trunk Line Phase 2 HFW Pipes

Tender Number

CMIT-PRT-10.30-150044-2-F2

Basic Information

According to the latest Trunk line Phase 2 FEED design, and due to the line pipes of trunk line phase 1 is deficiency, there need to add the corresponding pipe material procurement. The diameter of the line pipes is from 18 inch to 24inch. The total estimate quantity of the steel pipe procurement is 46.1 km. the actual purchase quantity of line pipes maybe adjust according to the actual trunk line project requirements. The line pipes shall be coating with external coating and internal coating.

 

Tender Fee

USD100 (ITT documents can be downloaded for free, but tender fee USD100 is required while tenderer submits tender proposals)

Tender Closing Date

17:00:00, on or before August 25th, 2016 (Dubai Time)

Contact email

faheddahhak@cmitfod.com; FaridKhussainov@cmitfod.com; alikarem@cmitfod.comex_zhr@cnoociraq.com;

Note: ITT documents and all Bulletins during the tender period will be published on the following website:

http://www.cnoociraq.com/share/page/site/BiddingDoc/documentlibrary#filter=path%7C//150044-2-F2%20Trunk%20Line%20Phase%202%20HFW%20Pipes

User name: contractor

Password: contractor

2         Tenderer shall be obligated to provide prequalification documents in accordance with international practice. The tenderer will be disqualified provided that it fails to provide prequalification documents in accordance with international practice. The prequalification documents provided should strictly follow the requirement of ITT.  The information below is the key items

2.1 Company does not accept agent bidding traders only manufacturers accepted.

2.2Supplier qualification: In accordance with America Petroleum Institute (API) certification of authorization to the supplier.

2.3The Supplier has its own whole process of iron smelting, steelmaking, and steel pipe manufacture factory.

 

2.4The Supplier must have its own anti-sulfur laboratory, and the laboratory needs to have ISO

 17025 Certificate.

2.5 The Supplier shall ensure 90% of the iron ore are from Australia or Brazil at least.

2.6 Rules of origin for pipes: Steel plates used in Steel pipes must be labeled of the original country.

2.7 Scope of Business

The prequalification documents should be provided on time required in VENDOR REGISTRATION AND PRE-QUALIFICATION. Failure to submit on time will lead to rejection.

 

3         Contact Information

All interested companies shall submit all the required tender documents to Dubai office/Iraq Office on or before Tender Closing Time.

Dubai office: Ms. Zhou Rui +971 42108174(only for submission of tender proposals)

Iraq Office: Mr. Fahed Dahhak. Ali Karem. Farid Khussainov

Office Tel:+861084527122( with voice prompt)+7+6219 Extension Number

4         Notice: The tenderer whom will be awarded the contract successfully shall pay the fee for the announcement.