Tender Announcement

CNOOC Iraq Limited, a company existing under the laws of British Virgin Islands, acting as lead contractor of the Technical Service Contract for Missan Oil Fields entered into by and between Missan Oil Company, TP Missan Limited and Iraqi Drilling Company, is pleased to make the following public tender announcement:

 

1.TENDER DATA SHEET (TDS):

Tender Title

Production Operation Service for DGS

Tender Number

CMIT-PRT-10.30-230040

Tender Announcement Website

ITT documents and all Bulletins during the tender period will be published on the following website:

https://www.cnoociraq.com/share/page/site/BiddingDoc/documentlibrary#filter=path%7C%2F230040%2520Production%2520Operation%2520Service%2520for%2520DGS%7C&page=1

 

User name: contractor

Password: contractor

P.S Some of the ITT documents have been encrypted for confidentiality reasons, thus; Bidders are kindly requested to send by email the Bid Acknowledgement to the following focal points ;

abderrahmanezanoun@cmitfod.com; ex_abderrahm@cnoociraq.com

arman@cmitfod.com; ex_arman@cnoociraq.com

ZulfiqarAli@cmitfod.com; ex_zulfiqar@cnoociraq.com

Hariindradi1@cmitfod.com; ex_hariindra@cnoociraq.com

Kamalait@cmitfod.com; ex_kamalait@cnoociraq.com

salimbrahmi@cmitfod.com; ex_salim.bra@cnoociraq.com

who shall then provide Bidders with the “Password”

 

The user name and password for access ITT are prohibited to change by Tenderer.

Composition of Invitation to Tender (ITT) packages

Tender Announcement

Section 1 INSTRUCTION TO TENDERERS

Section 2 PROPOSAL CONTENTS AND FORMS

Section 3 TECHNICAL REQUIREMENT

Section 4 SCHEDULE OF COMPENSATION

Section 5 PRO FORMA CONTRACT

ITT Section 1. Clause 9.0

Bid Closing Date: no later than 16:00 (Baghdad Time), on or before September 2, 2023.

ITT Section 1. Clause 4.2

The bid document purchase receipt must be received by emails to

abderrahmanezanoun@cmitfod.com; ex_abderrahm@cnoociraq.com

arman@cmitfod.com; ex_arman@cnoociraq.com

ZulfiqarAli@cmitfod.com; ex_zulfiqar@cnoociraq.com

Hariindradi1@cmitfod.com; ex_hariindra@cnoociraq.com

Kamalait@cmitfod.com; ex_kamalait@cnoociraq.com

salimbrahmi@cmitfod.com; ex_salim.bra@cnoociraq.com

 

(“Tender Contact Emails”) on or before deadline.

ITT Section 1. Clause 5

All clarification and correspondences from Tenderers must be sent to all aforementioned Tender Contact Emails with official letter.

ITT Section 1. Clause 10.2

Bid Proposals must be delivered to Iraqi Office

Attention:

Mr. Abderrahmane Zanoun, Mr. Arman Rakhmetov, Mr. Zulfiqar Ali, Mr. Hari Indradi, Mr. Kamal Ait Oudhia, Mr. Salim Brahmi

Address: Room 239, FOD Administrative Building. Work Base, CNOOC Camp, Missan Oil Fields.

Tel: 009647813981554, 009647828390533, 009647844036874, 009647844036856, 009647844036872, 009647816092985

ITT Section 1. Clause 11.1

Tenderer’s bid Proposal shall be irrevocable for a period of 240 calendar days (“Bid Validity Period”).

ITT Section 1. Clause 12.1

Fail to meet any of below key factors will lead to disqualification:

1) Scope of Business must be related to the scope of work of the tender.

2) Legal Entity and Qualification of Bidder

3) Bid proposals are in properly sealed condition

4) Bid Proposal Period of Validity shall be as required in this TENDER DATA SHEET (TDS) (aforementioned Clause 11.1).

5) Bid Bond submission

6) Signed & Stamped Cover Letter (as per Section 2 PROPOSAL CONTENTS AND FORMS, Attachment 2A: Proposal Format of Cover Letter)

7) Price proposal is separate from Technical & Commercial proposal

8) Bidder shall provide Quality Management System Certification ISO9001, Environmental Management System Certification ISO14001, Occupational Health and Safety Management System Certification ISO18001/ISO45001

9) The bidder shall have been working on the similar production operation service in oil and gas industry for the past three years (2020 to 2022)

10) The Contract value of bidder's similar production operation service shall be more than 8 million USD in the past 3 years (2020 to 2022), and at least one of them shall be valued more than 4 million USD

11) Bidder shall have its own camp in Missan oil field and provide proof document. Its capacity shall cover requirements of the material stock and living of service man power according to the SOW and manpower plans.

12) Bidder shall provide sufficient employees’ CV to cover the manpower requirement of this service contract, at least 20 engineers with valid H2S training certificate and 4 engineers with driven license for 2.0t forklift truck. The personnel certificates shall be attached as proof documents.

ITT Section 1. Clause15.1

Bid bond: 200,000 USD, The Bid Bond must be presented to Company in a separated and sealed envelope and duly marked and stamped on outer envelope.

The original validity of the bid bond shall be the same as aforementioned Bid Validity Period in Clause 11.1.

 

Cash Bid Bond will not be accepted from a Chinese Bidder that does not have overseas Bank account.

Tenderers should be advised that Cheques NO LONGER BE ACCEPTED as a Bid Bonds by Company.

ITT Section 2. Clause3.6

Joint bidding is NOT accepted by Company.

 

2. Tender Fee

Tender Fee Amount

100 USD

Tender Fee is required only for the bidder who decides to submit Tender Proposals, and the invoice shall be received at Contact Emails before submitting Tender Proposals. Failure to do so may lead to rejection. Payment can be cash or T/T to our financial department,

For T/T payment, Bidder must mention bidder name, tender number and title in the bank payment receipt, any receipt without bidder name, tender number and title will not be accepted.

Financial department (Contact information for Dubai office):

Financial department (Contact information for Iraqi Office):

  • Contact person: Mr. Qassim Wajid Hashim / Mr. Ali Kareem
  • Tel: +9647805492468 (Mr. Qassim Wajid Hashim), +9647805200901 (Mr. Ali Kareem)
  • E-mail: Qassimwajid@cmitfod.com / Alikareem@cmitfod.com
  • Address: CNOOC Buzurgan camp, Missan

 

3. This announcement is made both in English and in Arabic, if there is any discrepancy, the English version shall prevail.